All waste
has value.

Learn more

Our mission

Kubik is making cities waste-free, and industry part of the climate solution.

Starting in Ethiopia, with the cities and industries that need it the most.

A Kubik team member seen from behind wearing a hard hat and a shirt that reads We Build Dignity

Why now

Cities are the solution
to a global problem.

Africa's cities are growing faster than anywhere on earth, and their waste is growing with them; most of it buried or burned. At the same time, the industries building those cities are under real pressure to cut both carbon and cost.

Kubik has built a circular economy model that solves both.

Cities: the frontline

4% of Africa’s waste gets recycled

160M+ tonnes a year is dumped or burned.

Sources: UNEP, AUDA-NEPAD

Industries: climate problem to solution

37% of global CO₂ is from construction

Cement alone is ~8% — it has to get cleaner and cheaper.

Sources: UNEP, World Economic Forum

What we do

We turn a city's waste into
industry's low-carbon commodities.

We transform a city’s waste into industry’s low-carbon inputs, and the value flows back to the city.

Circular economy,
at its finest.

A city’s waste, turned into the materials that decarbonize industry — then the value returns home. Tap a step to follow the loop.

Digitally traceableEvery step tracked, from a collector’s hands to an industry’s input.
Women-ledPowered by a growing network of women waste collectors.

Where we work

Built for Africa.
Made in Ethiopia.

Our origins in Eastern Ethiopia have already become proof that a city’s waste can clean its streets and decarbonize its industry at the same time.

A blueprint for the continent.

Kubik’s women-led recycling network in Harar
Harar

The first plastic-waste-free city.

Since 2024, our partnership with the Municipality of Harar has transformed the city into one of the cleanest and most equitable waste management systems in Ethiopia.

15 yrscity partnership
800+women empowered in recycling
90%+PET plastic kept from landfill
Kubik’s landfill transformation site in Dire Dawa
Dire Dawa

A circular landfill in the making.

Through a multi-year partnership, we are transforming Dire Dawa’s landfill into a circular engine for producing low-carbon alternatives for the cement industry.

15 yrscity partnership
150+tonnes of waste processed daily
525 Gcalclean energy produced daily

Selected projects

View all projects

Who we are

We are a team of optimists who
love to get their hands dirty.

The Kubik team
Kidus Asfaw

Kidus Asfaw

Founder & CEO

Kidus is a problem-solver at heart. Named one of TIME's 100 Most Influential Climate Leaders, he started Kubik with a mission to build dignity through clean and affordable living for all. Before Kubik, Kidus worked at Google, the World Bank, UNICEF and Accenture, and holds an MPA from Princeton and a degree in biomedical engineering from Duke.

Management

Board

Backed by relentless optimists.

We are proud to have funds and foundations also betting on a waste-free, lower-carbon future for Africa.

All waste has value.

Let's talk if you want to be a part of our movement.